In a large building, knowing the real condition of every mechanical component is harder than it...
Case studies
Continue searching our blog!
Coordination and Safety on a Live Industrial Site
As part of the refurbishment of the sludge incineration line at the Strasbourg wastewater...
Cost and Time Monitoring: Vcad 5D BIM Reporting
When we talk about BIM, most people think of a 3D model of a building, a digital representation...
NWD and Multiple DWG in Power BI with Vcad
Introduction The integration of NWD models with DWG drawings represents a transformative step in...
Power BI and MS Project in a Simple Way for 5D
Introduction Construction is rapidly evolving with digitalization, and the use of Building...
REAL-TIME IOT DATA, MICROSOFT FABRIC AND VCAD #6
This article is part six in a series of articles in which we explore the creation of IoT reports...
Real-Time IoT data, Microsoft Fabric and Vcad #5
In previous articles, we have outlined the process of constructing a report that depicts real-time...
REAL-TIME IOT DATA, MICROSOFT FABRIC AND VCAD #4
This article describes the functioning of a report in Power Bi connected to devices present in an...
REAL-TIME IOT DATA, MICROSOFT FABRIC AND VCAD #3
This article is part of a series of publications that focus on the use of Vcad and other platforms...








